The
hotel is not the only project that we have. During the
past month we have discovered that our chapel was damaged
from Katrina as well. Cracks that developed after the
hurricane have opened up to 1 to 2 inch wide in each
corner of the brick. Our insurance company sent a engineer
to confirm that the openings were caused by up lift on the
roof. Not only has the brick cracked but the foundation as
well. Funds and volunteers are needed to help repair the
Chapel as well as construct the new 60 X 100 Chapel /
Auditorium.
This project is currently underway. Please contact
the camp if you would like to help.
Project Update
Construction
has begun on the new Chapel / Auditorium. The metal
framework is in place and the outer metal has been
started.
New
Chapel Design
The
existing chapel will hold 240 people. The new
building will hold 480 people. This will help solve
our space problem for many events.Below is a diagram of the
shape of the building. The building will be 100'L X
60'W. This will double the size of the original
chapel.
The
new chapel is located on the road to the lake
beside the old maintenance shed site, across from the
basketball court.
We still need $60,000 and volunteer teams to complete
the chapel. We will be honored to name the chapel for
a major donor.